Film Studio Travel Demand Management Plan

We prepared a TDM plan for a film studio to enable the developer to expand the studio. The original Resource Consent had significant limits on the use of the studio. The aim of the TDM plan was to determine whether the trips associated with the operations or event on site created more than minor adverse congestion or safety impact as the intersection with the state highway. If the effects were more than minor then the TDMP came into effect with measures to discourage private vehicle usage to reduce traffic on the road network.

The TDM plan allowed a much greater level of activity on the site than originally consented resulting in significant operational efficiencies for our client.